BUILDING DEVELOPMENT
MILESTONES
1960

Relocation within Marktbreit to Mainleite, including a hall with a residential building.
1973

Relocation from Marktbreit to Wiesentheid, 25 km away, to an industrial area. Move into a hall with residential building.
1976

First hall extension (production hall).
1983

Second hall extension (assembly hall).
1986

Third expansion (production hall, assembly hall and technical offices).
1992

Conversion of the residential building into an office building.
1998

Construction of a paint shop.
2004

Construction of the electrical workshop (ground floor), the electrical engineering offices (first floor), the training rooms (second floor) and the mechanical engineering offices (third floor).
2014

New construction of halls 7 and 10 for large parts storage.
2015

Construction of the new assembly hall 11 for eight lines and a logistics hall, hall 12, with an automated warehouse.
2019

Acquisition of a neighboring property with 10,000 m² of hall space and conversion with crane system and storage facilities.
2021

New construction of assembly hall 8 for an additional 6 lines.
2023

Installation of a 10,000 m² PV system on the hall roofs and installation of a 1.4 MW storage battery.
2024

Demolition of hall 2 and construction of a modern, high-ceiling production hall for large machine parts.